The day your solar system gets installed is exciting! Here's exactly what to expect so you're fully prepared.

WHAT TO EXPECT

A Typical Install Day

Most solar installations are completed in a single day. Here's how it typically unfolds.

7:00 - 8:00 AM

Crew Arrives

The installation team arrives with equipment. They'll introduce themselves, review the plan, and set up ladders and safety equipment.

8:00 - 10:00 AM

Racking Installation

Mounting hardware is secured to your roof. This involves attaching rails and flashing to create a watertight connection.

10:00 AM - 2:00 PM

Panel Mounting

Solar panels are carried to the roof and secured to the racking system. Wiring is run between panels.

2:00 - 4:00 PM

Electrical Work

The inverter is installed (often in garage or near electrical panel). Wiring is connected and the system is tied to your home's electrical.

4:00 - 5:00 PM

Testing & Cleanup

Crew tests connections, verifies everything is working, cleans up the job site, and walks you through the system.

How Long Does Installation Take?

1 Day
Solar Panels Only

Standard residential solar installations are typically completed in a single day (6-10 hours).

1-2 Days
Solar + Battery

Adding battery storage increases complexity. Some crews complete it in one long day; others split into two.

2-3 Days
Large/Complex Systems

Very large systems (15+ kW), multiple roof faces, or main panel upgrades may require additional time.

TIMING FACTORS

What Can Affect Timing?

While most installations go smoothly, a few factors can extend the timeline.

Battery Storage

Adding batteries requires additional electrical work, breaker installation, and integration testing.

Weather Conditions

Rain, high winds, or extreme heat can delay installation for safety reasons. Your installer will reschedule if needed.

Roof Complexity

Multiple roof planes, dormers, skylights, or steep pitches take longer to work around safely.

Electrical Panel Upgrades

Older homes may need a main panel upgrade to handle solar, which adds half a day or more.

What You Need to Do

Be home (or have someone home) during installation
Clear driveway space for installer vehicles
Ensure easy access to electrical panel (often in garage)
Move cars away from work area
Secure pets inside during installation